Southeast Roofing logoSoutheast
Roofing

Residential roofing

Roof replacement without the runaround

A full replacement is the biggest roofing decision a homeowner makes. We keep it simple: a free inspection, a straight recommendation, a clear price, and a crew that treats your property like their own.

Asphalt shingle tear-off in progress during a residential roof replacementShingle tear-off in progress

When repair stops making sense, we say so

Not every aging roof needs replacing, and we'll tell you when yours doesn't. But when leaks keep coming back, shingles are failing across whole slopes, or storm damage runs deeper than the surface, continuing to patch becomes the expensive option. That's when a full replacement earns its place: stopped leaks, restored insurability, and a couple of decades of not thinking about your roof.

Most of our residential replacements are completed in one to two days once materials arrive. We handle everything: permits where required, tear-off and haul-off, decking repairs, the full new system, and a final walkthrough with a magnetic sweep of your yard for nails.

If a storm is what brought you here, we also handle the insurance side: thorough documentation, reports in the format adjusters expect, and on-site adjuster meetings when needed.

Signs it's replacement time, not repair time

  • Leaks in multiple places

    One leak is a repair. Leaks in several rooms usually mean the system as a whole is done.

  • 20+ years on the clock

    At that age in our climate, individual repairs are patches on a failing system.

  • Widespread shingle failure

    Curling, cracking, or bald shingles across whole sections: not just isolated spots.

  • Major storm damage

    When wind or hail damage covers a large area, insurers and manufacturers both favor replacement.

  • A sagging roofline

    Visible dips can mean deck or structural moisture damage, have it inspected promptly.

  • Repairs that keep coming back

    If you're calling a roofer every year, the math has already flipped toward replacement.

Before the crew arrives: measurement, proposal, permits

A replacement starts on paper: a full-system inspection, measurements, and a written proposal that itemizes tear-off, decking allowance, underlayment, flashing, ventilation, the covering, and cleanup. Roofs are measured in squares, one square is 100 square feet of roof surface, and squares measure the roof, not the floor plan: pitch adds area, and hips, valleys, and dormers add cutting waste beyond the raw measurement.

Once you've picked the system and color, we handle permit review where your municipality requires one, order materials, and schedule delivery. Weather gets a vote. We won't tear off ahead of a system we can't dry in, so a forecast shift can move your date. We'd rather reschedule than gamble with your interior.

Getting your home ready

Tear-off day is loud, and the house shakes more than you'd think. A few minutes of preparation the evening before makes the day go smoothly:

  • Cover or move loose items in the attic: dust sifts through the deck boards during tear-off
  • Move vehicles out of the garage and driveway before the crew arrives
  • Satellite dishes usually need realignment by your provider after reinstallation
  • Point out HVAC line sets, low wires, and anything fragile along the eaves
  • Keep pets indoors or off-site, tear-off is loud, and gates get opened repeatedly
  • Leave driveway access clear for the dump trailer and material delivery

Tear-off, deck inspection, and change orders

We protect the property first, tarps over landscaping and against walls, then strip the roof to the deck. That's what separates a replacement from an overlay: with the old roofing gone, we can actually see the decking and fix what's wrong with it.

It's also the honest limit of any estimate: hidden deck damage can't be fully known before tear-off. Your proposal spells out how decking is handled; if we find rot beyond the allowance, we photograph it and talk with you before proceeding: no surprise line items after the fact.

Dry-in and the new system

With the deck sound, the system goes down in order: underlayment, self-adhering leak barrier in valleys and around penetrations, drip edge, new flashing at walls and chimneys, the ventilation the attic needs, then the covering, fastened to the manufacturer's specification. Most homes are done in one to two days once materials arrive; complex or multi-story roofs can run longer.

We finish with debris haul-off, a magnetic nail sweep of the yard and driveway, and a final walkthrough with you. Where the selected system qualifies, we complete the manufacturer warranty registration; if insurance was involved, we supply the documentation your carrier's file needs.

Choosing what goes back on

A replacement is the one moment to rethink the system itself, not just the color. Most of ours are architectural shingle, but standing seam and exposed-fastener metal both earn their place on the right house:

Replacement systems compared
SystemRelative costStrengthsTrade-offs
Architectural shinglesLower initial investmentWidest color range, fast install, easiest to repair and match laterCommonly shorter planning range than metal in our climate
Exposed-fastener metalModerate initial investmentDurable panels at a working-budget priceGasketed screws need periodic inspection over the roof's life
Standing seam metalHigher initial investmentConcealed fasteners, clean lines, long planning rangeFewer qualified installers; panel repairs are more involved
Service life is project-specific. It depends on the product, the assembly, ventilation, and exposure, not the category alone.

Our approach

What a replacement with us looks like

From first call to final walkthrough, you'll always know what happens next.

  • Free inspection & documentation

    We inspect the full system: shingles, flashing, decking, ventilation, and photograph everything we find.

  • A recommendation you can trust

    Repair or replace, in writing, with a clear price. If insurance applies, we help you through the claim.

  • Materials & scheduling

    You pick the system and color; we order materials and schedule the build. Most homes take one to two days.

  • Tear-off and deck check

    Old roofing comes off completely so we can inspect and repair the decking before anything new goes down.

  • Full-system installation

    Underlayment, valley and penetration protection, flashing, ventilation, and your new roof: installed to manufacturer spec.

  • Cleanup & walkthrough

    Debris hauled off, magnetic nail sweep of your yard and drive, and a final walkthrough with you.

How a roof is built

Every layer, and what it actually does

Tap any numbered part to see what it is, why it matters, and the shortcuts bad roofers take. This is what we install and inspect on every job.

Tap a hot spot to see what it does

Pre-formed ridge cap shingles capping the peak of a shingle roof.Ridge cap shingles seal and finish the roof's peak.

Ridge Cap

Caps the peak

What it is

Thicker, pre-bent shingles that cover the very peak where two roof slopes meet.

Why it matters

It seals the most exposed line on your roof and finishes it off cleanly.

If it's done wrong

Cutting up regular 3-tab shingles as 'ridge cap' (a common shortcut) cracks and leaks years early.

Want this done right? Free inspection

Factors that affect project pricing

No two replacements price the same, because no two roofs are the same. Here's what moves the number on your written proposal.

  • Squares and pitch

    Total roof surface, not floor area, sets material quantity; steeper pitches slow production.

  • Stories and access

    Second stories, tight lots, and long carries add handling and staging time.

  • Layers coming off

    Each existing layer multiplies tear-off labor and disposal weight.

  • Decking replacement scope

    Hidden rot found at tear-off is documented, discussed, and priced transparently.

  • The system you choose

    Shingle line, metal profile, and warranty tier each carry their own requirements.

  • Roof features

    Chimneys, skylights, valleys, and dormers take flashing and detail time a plain gable doesn't.

  • Ventilation and code items

    Intake corrections, ridge vents, and code-required drip edge are part of doing it right.

  • Permits and disposal

    Permit requirements and dump fees vary across our service area.

Real projects

Replacements we've completed recently

Real Southeast Roofing projects: from Hattiesburg and Petal to Jackson and the Coast.

Storm damage? We speak insurance.

Thorough documentation, reports in the format adjusters expect, and someone on your side at the adjuster meeting.

How claim assistance works

$0 down financing available

Apply through our partner GoodLeap in minutes and see the plans you qualify for, decide with real numbers in hand.

Explore financing options

Lifetime warranty

Manufacturer limited-lifetime warranty options are available on qualifying roofing systems. Ask what applies to your roof at your free inspection.

Start with a free inspection

FAQ

Roof Replacement questions, answered

How long does a roof replacement take?
Most residential replacements are completed in one to two days once materials arrive, depending on the size and complexity of the roof. We give you a schedule with your estimate and keep you posted if weather shifts it.
How much does a new roof cost?
It depends on the size, pitch, and complexity of your roof and the system you choose, which is why we quote from an actual inspection instead of guessing. The inspection and estimate are free, and financing through GoodLeap is available.
Do I need to be home during the work?
No. Most homeowners aren't. We confirm access and details ahead of time, and we're reachable throughout the day. You'll walk the finished job with us before we consider it complete.
What if it rains in the middle of the job?
We plan around it. We never tear off more roof than we can dry in the same day, and the underlayment and leak-barrier stage is designed to shed rain until the covering goes on. If a system moves in early, the roof gets tarped and secured, an in-progress roof with us is never an open roof.
What happens if you find rotten decking?
We repair or replace it before installing the new system, that's the point of a full tear-off. We photograph what we find and talk to you before doing work beyond the estimate.
Will you help with my insurance claim?
Yes. If storm damage is behind your replacement, we document everything, provide the reports your insurer needs, and can meet the adjuster at your home. The decision is your insurer's, but the documentation will be thorough.
What happens to my landscaping and yard?
We protect it. Tarps catch tear-off debris, materials are staged carefully, and we finish with a full cleanup and magnetic nail sweep of your yard, beds, and driveway.

Ready for a roof you don't have to think about?

Schedule a free inspection or get an instant estimate right now. $0 down financing available through GoodLeap.

Call NowFree Inspection